Back to AppzoukQEHSOps — Quality, Environment, Health & Safety

QEHSOps Modules

Quality, Environment, Health & Safety — in one platform

Nine modules covering project setup, contractor & employee management, toolbox meetings, permits to work, assets, incidents, quality checks, and live dashboards. Select a module to learn more.

Module 01

Project Configuration

The administrative backbone of QEHSOps. Configured before any operational module is used — defining the full project environment: organisational hierarchy, custom form templates, multi-stage approval workflow chains, team structures, GPS-mapped site zones, geo-fence boundaries, and notification rules. Administrators have complete control over how the platform behaves for every project.

Drag-and-Drop Form Field Types
RACIWorkflow Role Matrix
3Zone Types (Polygon, Circle, Freehand)
LiveMobile Form Preview

Key Features

Project Hierarchy Builder

Organisation → Project → Zone → Work Area → Work Package. Unlimited depth with drag-and-drop reordering and guided setup wizard.

Dynamic Form Builder

Drag-and-drop field types: text, number, date, dropdown, multi-select, signature, photo capture, GPS stamp, file upload, rating scale, and barcode scan.

Form Logic Engine

Conditional field visibility, mandatory rules, scoring weights, fail-threshold escalation triggers, and remediation action prompts built in.

Workflow & RACI Builder

Multi-stage approval chains — parallel or sequential routing, SLA timers, auto-escalation on breach, rejection routing, and RACI role assignment per stage.

Geo-fence Zone Manager

Draw site boundaries on an interactive Mapbox satellite map. Polygon, circle, and freehand drawing with snap-to-boundary precision and entry/exit rule configuration.

Team & Permission Management

Assign users and contractors with role, reporting line, and module-level permission settings. Bulk import via CSV supported.

Notification Template Engine

Configure push, SMS, and email alerts per event type and user role with variable placeholders (e.g. permit ID, worker name).

Document Library

Upload SOPs, SWMS, and JSAs with version control, effective date, supersession tracking, and mandatory acknowledgement flags.

Full Audit Trail

All configuration changes logged — user, timestamp, field-level before/after diff, and reason for change. Immutable for 7 years.

Configuration Workflow

  1. 1

    Project Setup Wizard

    Name, type, phases, dates, contract

  2. 2

    Org Hierarchy Definition

    Zones, work areas, work packages

  3. 3

    Form Templates Build

    Drag-and-drop with live mobile preview

  4. 4

    Workflow & RACI Config

    Multi-stage approvals with SLA timers

  5. 5

    Geo-fence Zone Drawing

    GPS boundaries on satellite map

  6. 6

    Team Assignment & Go-Live

    Roles, permissions, notifications active